ETS1.C: Optimizing the Design Solution
The iterative process of testing the most promising solutions and modifying what is proposed on the basis of the test results leads to greater refinement and ultimately to an optimal solution.
Showing all 2 results
-
Treating Dirty Water
$19.47 – $156.82Build and test models to illustrate water treatment processes.
View Product -
Testing a Clot Buster
$18.39 – $140.60Test a new clot busting drug and engineer a clot removing tool.
View Product
Showing all 2 results